◊ Sequence of operation preparation to meet the project specifications.

◊ Prepare the required I/O point list to achieve the required SOP.

◊ Schematic diagrams for the system.
    • Cables and wires recommendations.
    • Wiring and termination details.
    • Building level network topology.
    • Room level valves/ field devices wiring.
    • Field devices termination details.

◊ Room by room projection table (flow scenarios table).

itqan logo

◊ Training centre
    • R&D centre at our offices – Amman, Jordan.
    • Furnished with a complete set of valves & controllers to prepare and test the programming before starting the site commissioning.
    • On demand training.